A door and window schedule lists the sizes, материалы, остекление, hardware and performance requirements for each opening. For multi-unit projects, clear and consistent information helps manufacturers prepare accurate quotations and avoid production errors.
This guide covers the key schedule fields, dimension references, рейтинги производительности, quantity records and document revisions that project teams should check before placing an order.
What a Door and Window Schedule Actually Does
The schedule converts a design intent into a buildable instruction, and a quotation is only ever priced off the instruction.
A drawing set answers geography. A plan locates the opening, an elevation shows the wall, a large-scale detail shows the reveal and the sealant line. None of those sheets tells a plant how many millimeters of profile to extrude or which glass to order.
The schedule carries that load. One row per window type. The row states a reference code, a size with a declared basis, a material and a glazing make-up. It adds a finish, a hardware set, a swing or direction, a performance rating, and a count. A shop drawing then returns the same row as a drawing the site can approve.
A schedule written to serve a drawing set lists what a drafter needs to draw. A factory version has a harder test. Could a stranger, in another country, with no phone call and no site visit, buy the right aluminum, прокладки, glass and hardware from this row alone?
Our own intake page asks for exactly this document. We tell project teams to send architectural drawings, схемы окон и дверей, размеры открытия, product requirements or reference images, and we price from what arrives.
When a row cannot answer the stranger test, the gap gets filled by guesswork somewhere down the line. That is where the phrase “as per schedule” does real damage: every reader supplies the missing detail from their own side of the transaction.
The Columns a Factory Needs to Quote From

A column earns its place by fixing a buying decision; anything else costs you a clarification round later.
The table below is the set we work from on custom алюминиевые двери и окна. The third column is our own practice, stated as ours: what goes wrong on our side of the transaction when the value is missing from a row.
| Column | What the value must fix | What happens when it is missing |
|---|---|---|
| Reference code | One identifier every later document can reuse | Every later document invents its own name |
| Type and instance count | How many frames to build and how many rooms to fit | Order quantity becomes an argument on site |
| Size with a stated basis | Profile cutting lengths and glass ordering sizes | We guess which of three dimensions you meant |
| Material and alloy | Which die, which stock, which thermal break | Substitution happens at the extrusion, silently |
| Glazing make-up | Pane thickness, полость, покрытие, gas, edge seal | Tempered and Low-E become two different units |
| Готовая система | Предварительная обработка, coating type, color standard, глянец | A color name matches two powder codes |
| Комплект оборудования | Ручки, замки, петли, strikers, load per leaf | Frame prep is cut for the wrong package |
| Swing and orientation | Which jamb carries the hinge, which hand opens | Left-hand units arrive for right-hand rooms |
| Performance values | Test program, class and grade, size tested | The label cannot be produced at the tested size |
Columns That Change the Price
Four of those columns decide cost directly. Glazing make-up sets glass cost and can decide whether the frame needs a deeper cavity. Hardware set changes both the package price and the machining. Finish system decides whether the unit goes through anodizing or powder coating, which are two different processes. The performance values decide whether an existing test report covers the row or a new program is needed.
Material belongs in that group too, even though it reads as background detail. Our product pages state the alloy and temper outright, for example a 6063-T5 native aluminum profile, because the temper and the wall build change what a die can produce.
Columns You Can Drop
Drop a decorative name column when the reference code already does the work. Drop a separate hardware style column when a hardware schedule is issued as its own document, and cross-reference it instead. Avoid vague color names such as “charcoal.” Specify a RAL color code or another agreed color reference, along with the required coating system and performance specification, such as AAMA 2605 где это применимо.
Keep the manufacturer column only when it records a genuine project constraint, such as a proprietary system that the project is committed to using. If the frame is manufactured to your specified section details, naming a manufacturer in this column adds little value.
Which Dimension the Size Column Actually Lists

The same 36-by-80 unit produces three legitimate numbers, and a factory that guesses wrong builds the wrong object.
A schedule size can mean any of three dimensions, and the number itself does not say which one. A structural opening is the hole in the building. A frame size is the manufactured unit. A rough opening is the framed space the unit is set into, larger than the frame by an installation allowance.
Our own framing guidance shows how far apart those numbers run. Для 36-by-80 inch door, it advises adding about 2 дюймов по ширине и 2 к 2.5 дюймов к высоте. That yields an estimated rough opening of about 38 к 82 к 82.5 дюймы. It also states a consistent gap of 1/4 дюйм до 1/2 inch on each side between the jamb and the jack studs, to leave room for plumbing and squaring.
Read together, those lines say the allowance is not a constant. It moves with the door and frame specification, and with the shim space available on site. That is why the same guide tells installers to work from the manufacturer’s stated frame and rough-opening dimensions, не практическое правило.
The Same Number Three Meanings
A row listing 38 к 82.5 can be a framed space the builder already built or a unit nobody can manufacture. A row listing 36 к 80 can be the frame or the structural hole it fills. A quotation built on the wrong reading does not announce itself. The units ship, the opening is right, and the frame arrives two inches too wide to drop in.
The failure is silent because both numbers are plausible. Nothing in the drawing set contradicts a row whose number is the framed space rather than the frame. The contradiction appears with a shim pack and a level on site.
Name the Basis Once and Never Again
Put one sentence at the top of the schedule: sizes are stated as frame dimensions, or as structural openings, or as rough openings. Then hold that basis across every row, including the rows you copied from a previous project.
Two bases end up inside one schedule when rows are copied forward, a tower sheet carrying a detail from an older drawing. A reviewer catches the mix by checking one row against its own plan dimension, not by reading all of them.
Performance Columns a Label Can Prove
A PG number alone proves nothing; class, tested size and the underlying test values carry the proof.
North American fenestration products carry a performance designation for a reason. The NAFS primary designator is defined as a three- or four-part code covering performance class, performance grade, the maximum size tested to achieve that rating, and optionally the product type.
The same document prints the format a label must follow. A casement example reads: Class R – PG25: Size tested 760 × 1520 мм (~30 × 60 в). The class letters are not decoration. That standard also states a Performance Grade is achieved only on successful completion of all applicable tests, so the grade is a bundle of results, not a single number.
The gateway table in the same excerpt shows how the pieces sit together. Each class carries a published minimum design pressure and a published minimum water penetration resistance test pressure.
| Performance class | Minimum design pressure | Minimum water test pressure |
|---|---|---|
| Ведущий | 720 Па (15.04 PSF) | 140 Па (2.92 PSF) |
| LC | 1,200 Па (25.06 PSF) | 180 Па (3.76 PSF) |
| CW | 1,440 Па (30.08 PSF) | 220 Па (4.59 PSF) |
| AW | 1,920 Па (40.10 PSF) | 390 Па (8.15 PSF) |
The published minimums climb together class by class. Performance belongs on the row as class and grade, because a row that states only “tempered, Low-E” cannot be tested against anything.
Size Tested Bounds the Rating
The rating travels up to the tested size and no further. A row asking for a unit larger than the specimen behind its class and grade is not asking for the same product, even when the profile series matches.
This is why the schedule needs a maximum unit size column checked against the tested size, rather than a PG value dropped into a cell. We give the same advice on our рейтинги окон воздействия ураганов гид. Ask for the approval document that names the tested size range, because certified values travel with the whole assembly.
What NAFS-26 Changes on the Label
А 2026 edition of the standard changes what a schedule may ask for. Metal Construction News reports that the secondary designator became mandatory in NAFS-26, having previously been optional, and must appear in product test reports and labels.
It must show three values: positive design pressure, negative design pressure, and water penetration resistance test pressure. The same report notes the purpose: more detailed performance information on the label, giving clearer reading during submittals, inspections and on-site verification.
For a schedule, the practical effect is that the three columns are no longer a nicety. If the label must carry them, ask the row for them, and ask for them per type rather than per project.
We quote from your rows, return shop drawings per type under your reference codes, and give technical recommendations where a row is still open.
Прямой производитель с момента 2013 | 60,000+ м² завод| CAD and shop drawing support
Which Document Wins When Two Disagree
A value earns contractual weight by sitting on the governing document, not by being agreed in an email.
Federal contract practice states the ladder plainly. The precedence rule sits in the 48 CFR 552.236-21 supplement to the drawings clause, and the same clause lets large-scale drawings govern where they differ from small-scale ones. A schedule on a drawing outranks the notes around it: “Schedules on any contract drawing shall take precedence over conflicting information on that or any other contract drawing.”
Two consequences follow for anyone issuing a schedule. Первый, a schedule printed on a drawing sheet outranks conflicting notes elsewhere in the set, so the numbers you care about belong on that sheet. Второй, the ladder runs drawings to drawings, not correspondence to drawings.
A change agreed by email does not travel that ladder. It has to be pushed onto a re-issued sheet with a revision marker, or it will not exist at the moment that matters. Our own logistics guide describes the same discipline from the delivery side: receiving checks that components match the Window/Door Schedule in the permit documents.
Changes That Never Reach a Sheet
A value corrected late, verbally, for one type only does not reach the approved row. Nobody re-issues the schedule, so the approved document keeps the old number and the plant builds to the approved document. When the corrected dimension is needed downstream, the row is proof against it.
We ask for re-issued pages rather than confirmations. A revised sheet with a revision triangle is a short job for a drafter, and it settles an argument that otherwise costs a container.
Counting Types Instead of Instances
A factory quotes types, an installer walks instances, and a tally that mixes the two orders the wrong number of frames.
Type count and instance count answer different questions. Types decide how many cutting lists, dies, glass orders and hardware packages get made. Instances decide how many openings a crew finishes and how many units land on which floor.
Building information tools expose the same split. Autodesk’s Revit help describes the schedule option Itemize every instance as displaying all instances in individual rows. Clearing it collapses multiple instances into the same row, by the chosen sorting parameter.
A schedule can list one row per window type or one row per individual opening. For factory quotations, group identical units by type and show the total quantity. Keep a separate instance list when installation teams need opening-by-opening details.
The Quantity Column Needs Two Numbers
A set count alone may not provide enough information for production planning. Record the type quantity, opening quantity, and total area for each window type. These figures help the factory check material requirements and prepare an accurate quotation. A row reading “14 sets” cannot be verified against the floor plan without dimensions, especially in a mixed-CAD tower where window sizes differ across floors.
Including all three figures in each row gives the factory the information needed for material estimates, production planning, and pricing without relying on assumptions.
Turning the Approved Schedule Into a Purchase Order

Each purchase order line should match the approved schedule, including the reference code, количество, area, dimension basis, материал, заканчивать, остекление, hardware and performance requirements.
Use the same reference code across quotations, чертежи магазина, approvals and packing labels. Avoid renaming units or using informal descriptions.
Add a revision block showing the issue date, revision number and changes. This helps both parties follow the correct version. ОПУМЕНДВ also provides CAD drawings, shop drawings and section details for project coordination.
Часто задаваемые вопросы
What is a window schedule in construction?
It is a table in the drawing set listing every window type with its size, материал, остекление, заканчивать, hardware and performance. Drawings show where openings sit; the schedule states what fills them. Quotations, orders and labels are built from its rows, which makes it the document a factory actually prices.
Should the schedule list rough opening or frame size?
Either one is workable; an undeclared basis is not. State the convention once at the top of the schedule and hold it on every row, including types inherited from older drawings. Frame size is what gets built, rough opening is what gets framed, and the gap between them is an installation allowance that moves with the door and frame specification.
Can a window schedule be used to get a factory quotation?
Да, when the rows pass a simple test: could a supplier in another country buy the right profile, glass and hardware from the row alone, with no call? Add the dimension basis, the type count, the area per type and the performance values. A quotation from a thin schedule is priced on assumptions you never approved.
Who prepares the window schedule, the architect or the supplier?
The design team issues it inside the contract documents. The supplier returns shop drawings against those rows, and any change goes back onto a re-issued sheet rather than staying in correspondence. We can build the first draft from your drawings, but the version that governs stays a design-side document.
Is a window schedule the same as a bill of quantities?
Нет. A schedule fixes what each unit is; a bill of quantities prices the same rows for a tender. One is a technical document, the other a commercial one. That difference is why a quotation request written from a schedule should carry the schedule’s own reference codes, not new ones.
What happens when the schedule and the drawings disagree?
Ask which document governs before anybody orders. Federal contract language gives schedules on a contract drawing precedence over conflicting information on that or any other drawing, and lets large-scale details govern over small ones. Email agreements sit outside that ladder until they reach a re-issued sheet.